Short Lead Time for China Single Phase 2kVA 1800W Rack Mount 12V 7ah Battery Online UPS
We’ve numerous great employees customers excellent at promoting, QC, and working with kinds of troublesome difficulty inside the generation method for Short Lead Time for China Single Phase 2kVA 1800W Rack Mount 12V 7ah Battery Online UPS, For more information, please send email to us. We are looking forwards the opportunity to service you.
We’ve numerous great employees customers excellent at promoting, QC, and working with kinds of troublesome difficulty inside the generation method for 2kVA Online UPS, China UPS, we’ve been fully determined to control the whole supply chain so as to deliver quality merchandise at competitive price in a timely manner. We are keeping up with the advanced techniques, growing through creating more values for our clients and society.
Features
Little Hint
1. In the warranty period the machine has a problem, please contact the sales staff, we will be responsible for customer service.
2. Exceed the warranty period, improper operation and man-made damage, we will still give help and support, we will provide spare parts at a cost price.
3. According to the customer’s needs, we can provide unconventional, but the cost may be slightly higher than the traditional machine.
Applications
Data processing center, The host system, Computer servers, Medical, Traffic, Electricity, IT, Industrial and other industries.
Factory Production Line
Packaging
We’ve numerous great employees customers excellent at promoting, QC, and working with kinds of troublesome difficulty inside the generation method for Short Lead Time for China Single Phase 2kVA 1800W Rack Mount 12V 7ah Battery Online UPS, For more information, please send email to us. We are looking forwards the opportunity to service you.
Short Lead Time for China UPS, 2kVA Online UPS, we’ve been fully determined to control the whole supply chain so as to deliver quality merchandise at competitive price in a timely manner. We are keeping up with the advanced techniques, growing through creating more values for our clients and society.
MODEL | BNT990-M | BNT9150/180-M | BNT9300-M | |
Rated Capacity | Cabinet Capacity | 20-90kVA / 20-90kW | 25-150kVA / 25-150kW 30-180kVA / 30-180kW | 30-300kVA / 30-300kW |
One Ppwer Module Capacity | 20kVA /20kW, 25kVA /25kW,30kVA /30kW | |||
MAX. Power Module NO. | 3 | 5/6 | 10 | |
INPUT | ||||
Main Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 138~485Vac;305~485Vac load,138~305Vac load | |||
Phase | 3-phase in / 3-phase out | |||
Nominal Frequency(Hz) | 40-70 | |||
Power Factor | ≥0.99 | |||
Harmonic Distortion (THDi) | ≤3% (100% load) | |||
Bypass Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 220 Vac:25%(+10%,+15%,+20%) | |||
230 Vac:20%(+10%,+15%) | ||||
240 Vac:15%(+10%);-45%(-10%,-20%,-30%) | ||||
Phase | 3-phase in / 3-phase out | |||
Power Walking In | YES | |||
Bypass Back Irrigation | YES | |||
Generator Access | YES | |||
OUTPUT | ||||
Voltage(Vac) | 380/400/415±1% | |||
Power factor | 1 | |||
Frequency(Hz) | AC Mode | ±1%/±2%/±4%/±5%/±10% | ||
Battery Mode | (50/60±0.1%)Hz | |||
Waveform | Pure Sinewave | |||
Admissible Crest Factor | 3:01 | |||
Harmonic Distortion(THDV) | ≤2% (100%Linear Load);≤3% (100%Non-linear Load) | |||
Transfer Time(ms) | 0 | |||
Efficiency(%) | 95.50% | |||
Overload Capability | 1 hour for 110%, 10 mins for 125%,1 min for 150%, 200ms for >150% | |||
BATTERY | ||||
Maximum Charging Current(A) | 18 | |||
Nominal Voltage | ±180V/±192V/±204V/±216V/±228V/±240/±252/±264/±276/±288/±300Vdc | |||
(30/32/34/36/38/40/42/44/46/48/50 pcs) | ||||
ENVIRONMENT | ||||
Operating Temperature | 0℃~40℃ | |||
Storage Temperature | -25℃~55℃ | |||
Relative Humidity | 0~95% | |||
Altitude | < 1500m | |||
Noise Level(dB) | <58dB | <61dB | <68dB | |
PHYSICAL | ||||
Dimension (D x W x H) mm | UPS Cabinet | 600×850×1350 | 600×850×1350 600×850×1550 | 600×850×2000 |
Module | 440×620×86 | |||
Net Weight(kg) | UPS Cabinet | 140 | 155/170 | 290 |
Module | 21 |