Professional China China Online UPS Double Conversion 6kVA, 10kVA, 15kVA, 20kVA UPS
We emphasize progress and introduce new solutions into the market each individual year for Professional China China Online UPS Double Conversion 6kVA, 10kVA, 15kVA, 20kVA UPS, Safety as a result of innovation is our promise to each other.
We emphasize progress and introduce new solutions into the market each individual year for China UPS, Online Ups, We now have our own registered brand and our company is developing rapidly owing to high quality goods, competitive price and excellent service. We sincerely hope to establish business relations with more friends from home and abroad in the near future. We look forward to your correspondence.
Features
Little Hint
1. In the warranty period the machine has a problem, please contact the sales staff, we will be responsible for customer service.
2. Exceed the warranty period, improper operation and man-made damage, we will still give help and support, we will provide spare parts at a cost price.
3. According to the customer’s needs, we can provide unconventional, but the cost may be slightly higher than the traditional machine.
Applications
Data processing center, The host system, Computer servers, Medical, Traffic, Electricity, IT, Industrial and other industries.
Factory Production Line
Packaging
We emphasize progress and introduce new solutions into the market each individual year for Professional China China Online UPS Double Conversion 6kVA, 10kVA, 15kVA, 20kVA UPS, Safety as a result of innovation is our promise to each other.
Professional China China UPS, Online UPS, We now have our own registered brand and our company is developing rapidly owing to high quality goods, competitive price and excellent service. We sincerely hope to establish business relations with more friends from home and abroad in the near future. We look forward to your correspondence.
MODEL | BNT990-M | BNT9150/180-M | BNT9300-M | |
Rated Capacity | Cabinet Capacity | 20-90kVA / 20-90kW | 25-150kVA / 25-150kW 30-180kVA / 30-180kW | 30-300kVA / 30-300kW |
One Ppwer Module Capacity | 20kVA /20kW, 25kVA /25kW,30kVA /30kW | |||
MAX. Power Module NO. | 3 | 5/6 | 10 | |
INPUT | ||||
Main Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 138~485Vac;305~485Vac load,138~305Vac load | |||
Phase | 3-phase in / 3-phase out | |||
Nominal Frequency(Hz) | 40-70 | |||
Power Factor | ≥0.99 | |||
Harmonic Distortion (THDi) | ≤3% (100% load) | |||
Bypass Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 220 Vac:25%(+10%,+15%,+20%) | |||
230 Vac:20%(+10%,+15%) | ||||
240 Vac:15%(+10%);-45%(-10%,-20%,-30%) | ||||
Phase | 3-phase in / 3-phase out | |||
Power Walking In | YES | |||
Bypass Back Irrigation | YES | |||
Generator Access | YES | |||
OUTPUT | ||||
Voltage(Vac) | 380/400/415±1% | |||
Power factor | 1 | |||
Frequency(Hz) | AC Mode | ±1%/±2%/±4%/±5%/±10% | ||
Battery Mode | (50/60±0.1%)Hz | |||
Waveform | Pure Sinewave | |||
Admissible Crest Factor | 3:01 | |||
Harmonic Distortion(THDV) | ≤2% (100%Linear Load);≤3% (100%Non-linear Load) | |||
Transfer Time(ms) | 0 | |||
Efficiency(%) | 95.50% | |||
Overload Capability | 1 hour for 110%, 10 mins for 125%,1 min for 150%, 200ms for >150% | |||
BATTERY | ||||
Maximum Charging Current(A) | 18 | |||
Nominal Voltage | ±180V/±192V/±204V/±216V/±228V/±240/±252/±264/±276/±288/±300Vdc | |||
(30/32/34/36/38/40/42/44/46/48/50 pcs) | ||||
ENVIRONMENT | ||||
Operating Temperature | 0℃~40℃ | |||
Storage Temperature | -25℃~55℃ | |||
Relative Humidity | 0~95% | |||
Altitude | < 1500m | |||
Noise Level(dB) | <58dB | <61dB | <68dB | |
PHYSICAL | ||||
Dimension (D x W x H) mm | UPS Cabinet | 600×850×1350 | 600×850×1350 600×850×1550 | 600×850×2000 |
Module | 440×620×86 | |||
Net Weight(kg) | UPS Cabinet | 140 | 155/170 | 290 |
Module | 21 |