Fast delivery Modular 3 Phase Online UPS for Datacenter 100kVA 200kVA 300kVA
Our crew through skilled training. Skilled skilled knowledge, strong sense of company, to meet the company wants of customers for Fast delivery Modular 3 Phase Online UPS for Datacenter 100kVA 200kVA 300kVA, Being a young developing company, we might not the most beneficial, but we’ve been trying our greatest being your good partner.
Our crew through skilled training. Skilled skilled knowledge, strong sense of company, to meet the company wants of customers for China Rack Modular UPS and UPS Power, We’ve got sufficient experience in producing items according to samples or drawings. We warmly welcome customers from home and abroad to visit our company, and to cooperate with us for a splendid future together.
Features
Little Hint
1. In the warranty period the machine has a problem, please contact the sales staff, we will be responsible for customer service.
2. Exceed the warranty period, improper operation and man-made damage, we will still give help and support, we will provide spare parts at a cost price.
3. According to the customer’s needs, we can provide unconventional, but the cost may be slightly higher than the traditional machine.
Applications
Data processing center, The host system, Computer servers, Medical, Traffic, Electricity, IT, Industrial and other industries.
Factory Production Line
Packaging
Our crew through skilled training. Skilled skilled knowledge, strong sense of company, to meet the company wants of customers for Fast delivery Modular 3 Phase Online UPS for Datacenter 100kVA 200kVA 300kVA, Being a young developing company, we might not the most beneficial, but we’ve been trying our greatest being your good partner.
Fast delivery China Rack Modular UPS and UPS Power, We’ve got sufficient experience in producing items according to samples or drawings. We warmly welcome customers from home and abroad to visit our company, and to cooperate with us for a splendid future together.
MODEL | BNT990-M | BNT9150/180-M | BNT9300-M | |
Rated Capacity | Cabinet Capacity | 20-90kVA / 20-90kW | 25-150kVA / 25-150kW 30-180kVA / 30-180kW | 30-300kVA / 30-300kW |
One Ppwer Module Capacity | 20kVA /20kW, 25kVA /25kW,30kVA /30kW | |||
MAX. Power Module NO. | 3 | 5/6 | 10 | |
INPUT | ||||
Main Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 138~485Vac;305~485Vac load,138~305Vac load | |||
Phase | 3-phase in / 3-phase out | |||
Nominal Frequency(Hz) | 40-70 | |||
Power Factor | ≥0.99 | |||
Harmonic Distortion (THDi) | ≤3% (100% load) | |||
Bypass Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 220 Vac:25%(+10%,+15%,+20%) | |||
230 Vac:20%(+10%,+15%) | ||||
240 Vac:15%(+10%);-45%(-10%,-20%,-30%) | ||||
Phase | 3-phase in / 3-phase out | |||
Power Walking In | YES | |||
Bypass Back Irrigation | YES | |||
Generator Access | YES | |||
OUTPUT | ||||
Voltage(Vac) | 380/400/415±1% | |||
Power factor | 1 | |||
Frequency(Hz) | AC Mode | ±1%/±2%/±4%/±5%/±10% | ||
Battery Mode | (50/60±0.1%)Hz | |||
Waveform | Pure Sinewave | |||
Admissible Crest Factor | 3:01 | |||
Harmonic Distortion(THDV) | ≤2% (100%Linear Load);≤3% (100%Non-linear Load) | |||
Transfer Time(ms) | 0 | |||
Efficiency(%) | 95.50% | |||
Overload Capability | 1 hour for 110%, 10 mins for 125%,1 min for 150%, 200ms for >150% | |||
BATTERY | ||||
Maximum Charging Current(A) | 18 | |||
Nominal Voltage | ±180V/±192V/±204V/±216V/±228V/±240/±252/±264/±276/±288/±300Vdc | |||
(30/32/34/36/38/40/42/44/46/48/50 pcs) | ||||
ENVIRONMENT | ||||
Operating Temperature | 0℃~40℃ | |||
Storage Temperature | -25℃~55℃ | |||
Relative Humidity | 0~95% | |||
Altitude | < 1500m | |||
Noise Level(dB) | <58dB | <61dB | <68dB | |
PHYSICAL | ||||
Dimension (D x W x H) mm | UPS Cabinet | 600×850×1350 | 600×850×1350 600×850×1550 | 600×850×2000 |
Module | 440×620×86 | |||
Net Weight(kg) | UPS Cabinet | 140 | 155/170 | 290 |
Module | 21 |