Cheap price 20kVA UPS Double Conversion Sine Pure Wave 3 Phase 380V UPS
No matter new customer or outdated client, We believe in extensive phrase and trusted relationship for Cheap price 20kVA UPS Double Conversion Sine Pure Wave 3 Phase 380V UPS, The many time, now we have been paying consideration on all specifics to insure each product or service contented by our buyers.
No matter new customer or outdated client, We believe in extensive phrase and trusted relationship for China 3 Phase Online UPS and 40kVA Online UPS, We adhere to the honest, efficient, practical win-win running mission and people-oriented business philosophy. Excellent quality, reasonable price and customer satisfaction are always pursued! If you are interested in our products, just try to contact us for more details!
Features
Little Hint
1. In the warranty period the machine has a problem, please contact the sales staff, we will be responsible for customer service.
2. Exceed the warranty period, improper operation and man-made damage, we will still give help and support, we will provide spare parts at a cost price.
3. According to the customer’s needs, we can provide unconventional, but the cost may be slightly higher than the traditional machine.
Applications
Data processing center, The host system, Computer servers, Medical, Traffic, Electricity, IT, Industrial and other industries.
Factory Production Line
Packaging
No matter new customer or outdated client, We believe in extensive phrase and trusted relationship for Cheap price 20kVA UPS Double Conversion Sine Pure Wave 3 Phase 380V UPS, The many time, now we have been paying consideration on all specifics to insure each product or service contented by our buyers.
Cheap price China 3 Phase Online UPS and 40kVA Online UPS, We adhere to the honest, efficient, practical win-win running mission and people-oriented business philosophy. Excellent quality, reasonable price and customer satisfaction are always pursued! If you are interested in our products, just try to contact us for more details!
MODEL | BNT990-M | BNT9150/180-M | BNT9300-M | |
Rated Capacity | Cabinet Capacity | 20-90kVA / 20-90kW | 25-150kVA / 25-150kW 30-180kVA / 30-180kW | 30-300kVA / 30-300kW |
One Ppwer Module Capacity | 20kVA /20kW, 25kVA /25kW,30kVA /30kW | |||
MAX. Power Module NO. | 3 | 5/6 | 10 | |
INPUT | ||||
Main Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 138~485Vac;305~485Vac load,138~305Vac load | |||
Phase | 3-phase in / 3-phase out | |||
Nominal Frequency(Hz) | 40-70 | |||
Power Factor | ≥0.99 | |||
Harmonic Distortion (THDi) | ≤3% (100% load) | |||
Bypass Input | Nominal Voltage(Vac) | 380/400/415 | ||
Voltage Range(Vac) | 220 Vac:25%(+10%,+15%,+20%) | |||
230 Vac:20%(+10%,+15%) | ||||
240 Vac:15%(+10%);-45%(-10%,-20%,-30%) | ||||
Phase | 3-phase in / 3-phase out | |||
Power Walking In | YES | |||
Bypass Back Irrigation | YES | |||
Generator Access | YES | |||
OUTPUT | ||||
Voltage(Vac) | 380/400/415±1% | |||
Power factor | 1 | |||
Frequency(Hz) | AC Mode | ±1%/±2%/±4%/±5%/±10% | ||
Battery Mode | (50/60±0.1%)Hz | |||
Waveform | Pure Sinewave | |||
Admissible Crest Factor | 3:01 | |||
Harmonic Distortion(THDV) | ≤2% (100%Linear Load);≤3% (100%Non-linear Load) | |||
Transfer Time(ms) | 0 | |||
Efficiency(%) | 95.50% | |||
Overload Capability | 1 hour for 110%, 10 mins for 125%,1 min for 150%, 200ms for >150% | |||
BATTERY | ||||
Maximum Charging Current(A) | 18 | |||
Nominal Voltage | ±180V/±192V/±204V/±216V/±228V/±240/±252/±264/±276/±288/±300Vdc | |||
(30/32/34/36/38/40/42/44/46/48/50 pcs) | ||||
ENVIRONMENT | ||||
Operating Temperature | 0℃~40℃ | |||
Storage Temperature | -25℃~55℃ | |||
Relative Humidity | 0~95% | |||
Altitude | < 1500m | |||
Noise Level(dB) | <58dB | <61dB | <68dB | |
PHYSICAL | ||||
Dimension (D x W x H) mm | UPS Cabinet | 600×850×1350 | 600×850×1350 600×850×1550 | 600×850×2000 |
Module | 440×620×86 | |||
Net Weight(kg) | UPS Cabinet | 140 | 155/170 | 290 |
Module | 21 |